The last few weeks have seen lots of things progress at the new church building! Most of the internal walls have now been constructed so there is now a real sense of the proportions we can expect to enjoy when the congregation moves in.
The underfloor heating, insulation and concrete screed has also been installed (see photos below). There is now a real glimpse of what the final hall will look like.
All of the windows have also been installed with the exception of the front door which will come later due to needing a bigger access to the building for the time-being.